Definition and decision context
La tension n’est qu’une entrée ; niveau d’isolement, ligne de fuite, fonction mécanique et ferrures comptent aussi. The correct decision begins with the load path, intended function and approved project specification. A catalogue dimension on its own is not enough to establish compatibility.
Selection factors
01System and application02Mechanical requirement03Material and environment04Interfaces and installation05Documentation and inspection06Purchaser approval
Common mistakes
- Selecting from voltage or diameter alone.
- Mixing fittings without checking interface geometry.
- Assuming a general standard replaces a project drawing.
- Using an OEM report for a configuration it does not cover.
Engineering note
Une approbation spécifique au projet est requise.
Send the latest project specification, drawings and available load data for a reviewed recommendation.