Definition and decision context

La tension n’est qu’une entrée ; niveau d’isolement, ligne de fuite, fonction mécanique et ferrures comptent aussi. The correct decision begins with the load path, intended function and approved project specification. A catalogue dimension on its own is not enough to establish compatibility.

Selection factors

01System and application02Mechanical requirement03Material and environment04Interfaces and installation05Documentation and inspection06Purchaser approval

Common mistakes

  • Selecting from voltage or diameter alone.
  • Mixing fittings without checking interface geometry.
  • Assuming a general standard replaces a project drawing.
  • Using an OEM report for a configuration it does not cover.

Engineering note

Une approbation spécifique au projet est requise.

Send the latest project specification, drawings and available load data for a reviewed recommendation.