Definition and decision context
System voltage is only one input; insulation level, creepage, mechanical function and fittings also matter. The correct decision begins with the load path, intended function and approved project specification. A catalogue dimension on its own is not enough to establish compatibility.
Selection factors
01System and application02Mechanical requirement03Material and environment04Interfaces and installation05Documentation and inspection06Purchaser approval
Common mistakes
- Selecting from voltage or diameter alone.
- Mixing fittings without checking interface geometry.
- Assuming a general standard replaces a project drawing.
- Using an OEM report for a configuration it does not cover.
Engineering note
Требуется согласование для конкретного проекта.